Project name

500kW/h Power Generation Project through Wood Chip Gasification in Slovenia

Project date

Sep, 2023

Project overview

The project is located in Slovenia and was put into service in September 2023. The wood chips have been used as feedstock for an updraft fixed-bed gasifier with rated gas production of 1500Nm3/h, a set of gas purification equipment, and a set of 400kW internal combustion generator set and its supporting equipment. Since its operation, the annual consumption of wood chips is 4,480 tons, the annual power generation is 2.8 million kilowatts, and the annual output of charcoal is about 840 tons. The charcoal is used to make machine-made charcoal. There is no emissions of tar, sewage or ash for the entire system.